Operational
Velanja Plant
Survey No. 18, NH-8 to Velanja Road, Village Antroli, Taluka Kamrej, Surat, Gujarat 394150
Customised solutions, rigorous quality control and a dedication to eco-friendly practice are the cornerstones of our manufacturing process.
Both Surat plants cure with a fully automatic steam-curing system rather than water curing, and batch with RO-treated water from three RMC plants. Every unit is lifted, stacked and dispatched with our own EOT and hydra cranes.
We take pride in delivering not just products, but precision, reliability and consistent quality.
Land, capacity and status of each plant.
Operational
Survey No. 18, NH-8 to Velanja Road, Village Antroli, Taluka Kamrej, Surat, Gujarat 394150
Operational
Expansion in progress.
Regional office: Khata No. 501, Village Sancholi, Tehsil Sohna, Gurgaon, Haryana 122103
The same route for every unit, checked at every step.
Our R&D team details the section and reinforcement, and the moulds are made in-house for a clean demould.
Every truck of sand and aggregate is checked by our QC engineer to the IS code before it is allowed to unload.
Three RMC plants — Schwing Stetter and KYB Conmat — batch M50 to M75 mixes with RO-treated water.
Units cure in a fully automatic steam-curing system instead of water curing, for consistent strength on a fixed cycle.
Cube, slump, V-funnel, rebound hammer and core tests, with independent third-party testing on top.
EOT cranes from 3 to 15 tonnes and eight hydra cranes stack and load units for delivery straight to the trench.
Batching, curing, lifting and testing — all in-house.
Schwing Stetter and KYB Conmat batching plants for consistent, high-strength mixes.
Full automatic steam curing — no water curing — for strength on a controlled cycle.
Mix water is treated through our own RO plant.
Bulk cement storage feeding the batching plants.
Overhead cranes for demoulding, handling and stacking.
Mobile lifting across the yard and for loading trucks.
Testing for materials and concrete on site.
Production, stock and dispatch tracked in ERP software.
Stacking yards of 12,000 T and 20,000 T for ready stock.

56 staff and 400+ skilled and semi-skilled workers run our plants — with safety built into every shift.
Organised yards and clear walkways, every shift.
Every employee and worker uses safety gear on the floor.
A dedicated safety inspector watches over the plant.
Crews are trained on handling, lifting and quality.
We celebrate the festivals as one team.
Tell us the quantities and the programme. We'll schedule the casting to match your site.